Sains Malaysiana 41(10)(2012): 1177–1185
Developing
Priorities and Ranking for Suitable Forest Road Allocation Using Analytic
Hierarchy Process (AHP) in Peninsular Malaysia
(Membangunkan Keutamaan dan Taraf untuk Perancangan Jalan Hutan
Berasaskan
Proses Hierarki Analitik (AHP) di
Semenanjung Malaysia)
K. Norizah
& I. Mohd. Hasmadi*
Forest
Surveying and Engineering Lab, Faculty of Forestry, Universiti Putra Malaysia
43400
UPM, Serdang, Selangor, Malaysia
Received: 8 August 2011 / Accepted: 22 May 2012
ABSTRACT
In hilly forest area, aligning forest roads is the key towards an effective and sustainable forest management. Constraints in forest road planning
are mainly due to environmental factors and topographical conditions.
Selecting the criteria for planning forest road and setting the priorities, ranking them
for environmental sustainability and reduce cost in road construction
is important. Different criteria are required at different forest area since
the quantifiable relationship between cause and effect to meet the goal are not
comprehensively prioritized. In order to solve the problem, the relative
importance factor from multi criteria basis, namely Analytic Hierarchy Process
(AHP)
was applied. Therefore, the objective of this study was to develop priorities
and rank a selected criterion for planning forest road in hilly area using AHP approach.
Four criteria had been identified to meet the goal of suitable forest road
allocation namely slope, river crossing, elevation and existing forest road.
The suitable criteria selected were sorted with weight in ranking order to
minimize the impact of timber harvesting. Our results showed that the
priorities and ranking were as follows; slope (w = 0.558),
followed by river crossing (w = 0.303), elevation (w = 0.095) and
lastly existing forest road (w = 0.044), respectively. Therefore, the
relative preference factor developed in this study can be used by the Forestry
Department for formulating suitable forest road allocation in hilly area
simultaneously to be integrated with geographic information system technology.
Keywords: Analytical hierarchy process; forest road planning;
harvest planning; priorities criteria
ABSTRAK
Di kawasan hutan berbukit, penjajaran jalan hutan adalah faktor
utama untuk mencapai pengurusan hutan yang berkesan. Masalah di dalam
perancangan jalan hutan selalunya berkait dengan faktor alam sekitar dan
keadaan topografi. Membuat pilihan bagi beberapa kriteria tertentu untuk
mengurangkan kos perancangan adalah perlu. Kriteria yang berbeza diperlukan
untuk kawasan hutan yang berlainan kerana hubungannya dikaitkan dengan sebab
dan akibat tidak selalunya diberi keutamaan secara komprehensif untuk mencapai
objektif pengurusan. Maka untuk menyelesaikan masalah ini, faktor-faktor
relatif yang penting telah dinilai berasaskan kriteria iaitu Proses Hierarki
Analitik (AHP). Objektif kajian ini ialah untuk membangunkan
keutamaan dan taraf beberapa kriteria yang telah dipilih untuk perancangan
jalan hutan di kawasan berbukit menggunakan pendekatan AHP.
Empat kriteria telah dikenal pasti untuk mencapai objektif penjajaran jalan
hutan yang bersesuaian iaitu cerun, lintasan sungai, ketinggian dan jalan hutan
yang sedia ada. Kriteria yang bersesuaian telah disusun mengikut berat
keutamaan dalam susunan yang teratur untuk meminimumkan kesan penuaian hutan.
Daripada keputusan, keutamaan/pemberat dan susunan kriteria adalah seperti
berikut: cerun (w = 0.558), diikuti oleh sungai (w = 0.303), ketinggian (w = 0.095)
dan seterusnya jalan hutan yang sedia ada (w = 0.044). Faktor relatif
yang telah dibangunkan dalam kajian ini boleh diguna pakai oleh Jabatan
Perhutanan untuk membuat perancangan jalan hutan yang bersesuaian di kawasan
hutan bukit seterusnya diguna pakai bersama dengan teknologi sistem maklumat
geografi.
Kata kunci: Kriteria keutamaan, perancangan
jalan hutan; perancangan penuaian. proses hierarki analitik
REFERENCES
Abdi,
E., Majnounian, B., Darvishefat, A., Mashayekhi, Z. & Session, J. 2009. A
GIS-MCE based model for forest road planning. Journal of Forest Science 55(4):
171-176.
Abdul
Rahim, A.S., Mohd Shawahid, O. & Zariyawati, M.A. 2009. A comparison
analysis of logging cost between conventional and reduced impact logging
practices. International Journal of Economic and Management 3(3):
354-366.
Coutler,
E.D. 2004. Setting forest road maintenance and upgrade priorities based on
environmental factor and expert judgement. Ph.D (Thesis), Oregon State
University, United States, 218 p. (Unpublished).
Coutler,
E.D., Session, J. & Wing, M.G. 2006. Scheduling forest road maintenance
using the analytical hierarchy process and heuristic. Silva Fennica 40(1): 143-160.
Dahlin,
B. & Fredriksson, J. 1995. Computer-assisted forest road planning- A
proposed interactive model with special emphasis on private forest land. International
Journal of Forest Engineering 6(2): 35-39.
Forestry
Department Peninsular Malaysia (FDPM). 1999. Spesifikasi Jalan Hutan (Jalan Tuju dan Lorong Penarik) untuk
Semenanjung Malaysia, Kuala Lumpur: Forestry Department Peninsular
Malaysia.
Forestry
Department Peninsular Malaysia (FDPM). 2010. Garis Panduan Jalan Hutan 2010. Kuala Lumpur: Forestry Department
Peninsular Malaysia.
Holmes,
T.P., Blate, D.M., Zweede, J.C., Pereira, R., Barreto, P., Boltz, F. &
Bauch, R. 2002. Financial and ecological indicators of reduced impact logging
performance in the eastern Amazon. Forest Ecological Management 163:
93-110.
Islam,
R. & Abdullah, N.A. 2006. Management decision making by the analytic
hierarchy process: A proposed modification for large scale problems. Journal
of International Business and Entrepreneurship Development 3(1/2): 18-40.
Johnson,
R.A. & Madison, M.E. 1994. Tying impact mitigation requirements to local
general plans, Journal of Environmental Impact Assessment 14: 61-74.
Judibal,
C.C. 2000. GIS-based support system for tactical timber harvesting planning;
designing and development. Ph.D (Thesis), Universiti Putra Malaysia, Serdang,
Selangor, Malaysia. 174p. (unpublished).
Kamaruzaman,
J. 2008. Construction of new forest road in Malaysia using a GIS-based decision
support system. Journal of Computer and Information Science 1(3): 48-
59.
Malczewski,
J. 1999. GIS and Multicriteria Decision Analysis. New York: John Wiley
and Sons.
Mohd
Hasmadi, I. 2005. Application of geoinformatics technology to forest harvesting
in Malaysia. PhD (Thesis), Cranfield University, United Kingdom. 330p.
(unpublished).
Mohd
Hasmadi, I., Kamaruzaman, J. & Muhamad Azizon, J. 2008. Forest road
assessment in Ulu Muda Forest Reserve of Peninsular Malaysia. Journal of
Modern Applied Science 2(3): 101-108.
Mohd
Hasmadi, I. & Kamaruzaman, J. 2009. Planning of access road using satellite
technology and best path modeling. Journal of Modern Applied Science 3(3):
83- 89.
Muziol,
C. 1999. The zonation of production forest into timber production restricted
timber production and protection forest areas: An important tool for mitigating
the impact of timber harvesting, (eds.) Shamsudin, I., Nur Hajar, Z.S. &
Choon, K.K. Proceeding of the Tropical Forest Harvesting: New Technologies
Examined. Primula Parkroyal Hotel, Terengganu, 22-24 November, pp. 136-165.
Naghdi,
R., Bagheri, I., Ghajar, E., Taheri, K. & Hasanzad, I. 2008. Planning the
most appropriate forest road network considering soil drainage and stability
using GIS in ShafaroudWatershed-Guilan.
http://www.gisdevelopment.net/appplication/utility/transport/ma08_79.html.
Retrieved 1 July 2010.
Rafiei,
A.A., Lotfalian, M., Hosseini, S.A. & Parsakhoo, A. 2009. Determining the
optimum road density for ground skidding system in Dalak Kheyl Forest hyrcanian
zone. World Applied Science Journal 7(3): 263-270.
Roh,
T.H., Lee, J.C., Kim, H.G., Kim, J.J. & Jung, Y.H. 2008. Construction on
decision support system for route location based on GIS. The International Archives
of the Photogrammetry, Remote Sensing and Spatial Information Sciences XXXVII(B2):
555-566.
Saaty,
T.L. 1977. A scaling method for priorities in hierarchical structures. Journal
of Mathematical Psychology 15: 234-281.
Saaty,
T.L. 1980. The Analytic Hierarchy Process. New York: McGraw Hill.
Saaty,
T.L. 1990. How to make a decision: The analytic hierarchy process. European
Journal of Operational Research 48: 9-26.
Samani,
K.M., Hosseiny, S.A., Lotfalian, M. & Najafi, A. 2010. Planning road
network in mountain forests using GIS and Analytical Hierarchical Process
(AHP). Caspian Journal Environmental Science 8(2): 151-162.
Shiba,
M. 1995. Analytic hierarchy process (AHP) based multi attribute benefit
structure analysis of road network system in mountainous rural areas of Japan. Journal
of Forest Engineering 7: 14-50.
Slotterback,
C.S. 2008. Evaluating the implementation of environmental review mitigation in
local planning and development processes. Environmental Impact Assessment
Review 28: 546-561.
Store,
R. & Kangas, J. 2002. Integrating spatial multi-criteria evaluation and
expert knowledge for GIS-based habitat suitability modelling. Landscape and
Urban Planning 55: 79-93.
Tan,
J. 1999. Locating forest roads by a spatial and heuristic procedure using
microcomputers. International Journal of Forest Engineering 10(2): 1-10.
Triantaphyllaou,
E. & Mann, S.H. 1995. Using the analytic hierarchy process for decision
making in engineering applications: Some challenges. International Journal
of Industrial Engineering: Applications and Practices 2(1): 35-44.
Trussat,
S., Messier, D., Roquet, V. & Aki, S. 2002, Hydropower projects: A review
of most effective mitigation measures. Journal of Energy Policy 30:
1251-1259.
Wan
Mohd, S.W.A. & Mohd Paiz, K. 2003. Alternatives reduced impact logging
techniques in Peninsular Malaysia. In: Proceeding of International Expert
Meeting on the Development and Implementation of National Codes of Practices
for Forest Harvesting- Issues and Options. Kisazaru City, Chiba prefecture,
Japan, 17-20 November, 13p.
*Corresponding
author; email: mhasmadi@putra.upm.edu.my