| Sains Malaysiana 38(6)(2009): 901–909
          
         
             
           
             
           Peningkatan Keupayaan Pembangunan Produk Baru Melalui Pemodelan Matematik
            
           (Improving
            New Product Development using a Mathematical Model)
            
           
             
           Muhammad Marsudi, Dzuraidah Abdul Wahab
            
           Lily Amelia & Che Hassan Che Haron*
            
           Jabatan Kejuruteraan Mekanik dan Bahan
            
           Fakulti Kejuruteraan dan Alam Bina, Universiti Kebangsaan Malaysia
            
           43600 UKM Bangi, Selangor
            D.E. Malaysia
            
           
             
           Diserahkan: 4 November 2008 / Diterima: 18 Febuari 2009
            
           
             
           ABSTRAK
            
           
             
           Kertas ini membincangkan pembangunan suatu alat sokongan pembuat keputusan dalam mereka bentuk produk berasaskan teori baris-gilir yang dikaitkan dengan maklumat masa kitar pembuatan. Dengan penggunaan alat sokongan ini, kesan reka bentuk sesuatu produk terhadap parameter kapasiti dan masa kitar pembuatan sesuatu sistem pembuatan sedia ada dapat ditentukan. Aplikasi alat sokongan ini membolehkan kumpulan pembangunan produk membangunkan produk sebenar pada masa yang singkat, meminimumkan kos pembangunan serta mengurangkan keperluan untuk mereka bentuk semula produk. Alat sokongan ini telah diaplikasikan pada sebuah industri automotif tempatan dan hasil kajian menunjukkan bahawa alat sokongan tersebut telah berjaya melakukan analisis masa kitar dan tahap penggunaan pada sistem pembuatan sedia ada. Pada jumlah keluaran 44 komponen/jam dan saiz sesekumpul 80, hasil analisis menunjukkan tahap penggunaan pada 98% dengan masa kitar 17.8 jam bagi pemprosesan gabungan produk yang terdiri daripada komponen dengan reka bentuk baru dan reka bentuk sedia ada.
            
           
             
           Kata kunci: Kapasiti pengeluaran; masa kitar; teori baris gilir; reka bentuk produk; sistem pembuatan
            
           
             
           ABSTRACT
            
           
             
           This paper
            discusses the development of a decision support tool based on the queuing
            theory which was linked to manufacturing cycle time information. With the use
            of this tool, the effects of product design to the capacity and manufacturing
            cycle time of an existing manufacturing system can be determined. The decision
            support tool enabled the product design team to develop products in a shorter
            lead time with reduced cost, while minimising redesign during the design development process. The tool has been applied to a
            local automotive industry and results from the study showed that the tool has
            been successful in analysing cycle time and utilisation of the existing manufacturing system. For a
            throughput of 44 parts/hour and batch size 80, results from the analysis show a utilisation rate of 98% and cycle time of 17.8 hours,
            for the production of mixed products that comprised parts with new and existing
            design. 
  
 
             
           Keywords:
            Production capacity; cycle time; queuing theory; product design; manufacturing
            system
  
 
             
           RUJUKAN
            
           
             
           Ahmadi, R. & Wang, R.H. 1999. Managing development risk in product design
            process. Operations Research 47(2): 235-246.
  
           Balachandra, R. 1991. Some strategic aspects of faster new product introduction. Engineering Management Conference 226-229.
            
           Bermon, S., Feigin, G. & Hood, S. 1995. Capacity
            analysis of complex manufacturing facilities. Proceedings of the 34th
              Conference on Decision and Control 1935-1940.
  
           Bralla, J.G. 1996. Design for Excellence. USA: McGraw-Hill Inc.
            
           Burhanuddin S. & Randhawa, S.U. 1992. A framework for
            integrating manufacturing process design and analysis. Computers and
              Industrial Engineering 23(1-4): 27-30.
  
           Chincholkar, M.M. 2002. Design for Production: Using Manufacturing Cycle Time Information to Improve
            Product Development. Maryland: Institute for Systems Research.
  
           Elhafsi, M. & Rolland, E. 1999. Negotiating price and delivery date in a stochastic
            manufacturing environment. IIE Transactions 31: 255-270.
  
           Govil, M. 1999.
            Integrating product design and production: Designing for time-to- market. Tesis PhD. USA: University of Maryland.
  
           Hopp, W.J. & Spearman, M.L. 2000. Factory Physics. Second edition. Boston: Irwin/McGraw Hill.
            
           Ingress Precision. 2004. Ahead of Technology. Cetakan Brosur.
            
           Koo, P.H., Moodie, C.L. & Tavalage, J.J. 1995. A spreadsheet model approach for integrating static capacity
            planning and stochastic queuing models. International Journal of
              Production Research 3(5): 1369-1385.
  
           Singh, N. 1996. Systems
            Approach to Computer-integrated Design and Manufacturing. New York: John
            Wiley and Sons.
  
           Soundar, P. & Bao, H.P. 1994. Concurrent design of products for
            manufacturing system performance. Proceedings of the IEEE 1994
              International Engineering Management Conference 233-240.
  
           Suri, R. & Diehl, G.W. 1985. MANUPLAN, A precursor to simulation for
            complex manufacturing systems. Proceeding of the
              Winter Simulation Conference 411-428.
  
           Taylor, D.G., English, J.R. & Graves, R.J. 1994. Designing new products: Compatibility with existing product
            facilities and anticipated product mix. Integrated Manufacturing Systems 5(4/5):
            13-21.
  
           Vollmann, T.E., Berry, W.L. & Whybark,
            D.C. 1997. Manufacturing
              Planning and Control Systems. Fourth
                edition. New York: Irwin/McGraw-Hill.
  
 Wei, Y. 2001. Concurrent design for optimal
            quality and cycle Time. Tesis PhD. Massachusets: Department of Mechanical Engineering,
            Massachusetts Institute of Technology.
  
           Wei, Y. & Thornton, A.C. 2002. Concurrent design for optimal production
            performance. Paper DETC2002/DFM-34163 in CD-ROM Proceedings of 2002
              ASME Design Engineering Technical Conference.
  
           
             
           *Pengarang untuk surat-menyurat; email: chase@vlsi.eng.ukm.my
            
           
             
           
           
            
             |